Skip to content
Framework · Saudi Arabia & GCC

PDPL (UAE): what a configuration review can show, and what it cannot

PDPL (UAE) is one of the frameworks we score. Here are its 15 scored controls, split by what a review of your uploaded configuration files can show.

15controls scored
0reached from uploaded files
3need a person’s answer
12not scored

In short

PDPL (UAE) from configuration files: which PDPL (UAE) controls the settings in uploaded firewall, identity and cloud exports bear on, which need a person's answer, and which are not scored.

None of the 15 PDPL (UAE) controls we score is reached by a check we count today, directly or through the crosswalk. What the review shows for PDPL (UAE) comes from your answers and the products you own.

Controls scored15
Reached from uploaded files0
Need a person’s answer3
Not scored12
Counted checks that touch a control0

Sources: how a framework is scored.

What a configuration review can show

We read the configuration files you upload, never the live systems. The counts below come from the checks shown firing on a file in its system's documented layout. In all, 1,390 checks run across 35 systems. A finding from a check fails each control the check links to, and a control is met by evidence only when a file shows it.

No PDPL (UAE) control is read from files directly: no check's own link names a control the scored catalog holds.

No PDPL (UAE) control is reached through the crosswalk from a check's links.

No check we count today links to a PDPL (UAE) control, directly or through the crosswalk.

Which checks touch which control

No check we count touches a PDPL (UAE) control today, directly or through the crosswalk. What the review shows for PDPL (UAE) comes from your answers and the products you own.

What needs a person’s answer

3 controls are scored, but no check reads them from a file. What the review holds for them is what your team tells us: the products you own, from which the score is modeled (MODELED), or a statement that the control holds, which reads DECLARED (your team told us, not read from a file). Until then each reads no evidence held.

ControlWhat it covers
Art-19Personal data security measures
Art-20Data breach notification to UAE Data Office
Art-23Privacy by design and by default

What we do not score

12 controls are left out of the score: no product in our catalog maps to them, the crosswalk carries nothing to them and no check we count reads them. The score counts them as not assessed, never as met.

ControlWhat it covers
Art-9Data subject rights: access, correction, erasure, portability
Art-21Data subject notification of breaches
Art-22Data Protection Officer designation
Art-24Data Protection Impact Assessment
Art-26Cross-border transfer of personal data
Art-27Records of processing operations
Art-28Pseudonymization and encryption
Reg-2024-1Access controls and authentication
Reg-2024-2Logging and monitoring
Reg-2024-3Backup and recovery
Reg-2024-4Vendor and processor agreements
Reg-2024-5Data classification and retention

How the score is built

No product in our catalog maps to any PDPL (UAE) control directly. Every control the score assesses takes credit through the crosswalk, which is capped per control, so PDPL (UAE) reads not directly scored: the review prints no number for it rather than a made-up one.

The score is modeled from the products you told us you own, and covers technical controls. Findings read from your files are graded on their own, and where an answer and a file disagree, the file wins. The caps, the crosswalk and the scope are set out on the method page.

Questions

Which PDPL (UAE) controls can a configuration review show?

None of the 15 PDPL (UAE) controls we score is reached by a check we count today, directly or through the crosswalk. What the review shows for PDPL (UAE) comes from your answers and the products you own.

Which PDPL (UAE) controls need a person's answer?

3 controls are scored from what your team tells us: the products you own, from which the score is modeled, or a statement that the control holds, which is DECLARED. Until then each reads no evidence held.

Which PDPL (UAE) controls are not scored?

12 controls are not scored: no product in our catalog maps to them, the crosswalk carries nothing to them and no check reads them. The score counts them as not assessed, never as met.